Harlem Bespoke: It takes a small village to keep the historic public pools in tip top shop for the summer season and we noticed that a lot of workers have already started all of the preparation needed for the season at Highbridge Park just east of Amsterdam Avenue and West 173rd Street. This is the famous location of the pool scene that was featured in the movie In the Heights and is free to public once all of the spring restoration has been done. We especially love the dramatic view of the restored Highbridge Water Tower in the background and the close proximity to the actual bridge connected to it. With that said, the weather is still a little cold these days and everything will not be open until the June 28th, 2022 official NYC opening date.
Monday, May 23, 2022
UPTOWN POOLS PREPARE FOR SUMMER 2022
Harlem Bespoke: It takes a small village to keep the historic public pools in tip top shop for the summer season and we noticed that a lot of workers have already started all of the preparation needed for the season at Highbridge Park just east of Amsterdam Avenue and West 173rd Street. This is the famous location of the pool scene that was featured in the movie In the Heights and is free to public once all of the spring restoration has been done. We especially love the dramatic view of the restored Highbridge Water Tower in the background and the close proximity to the actual bridge connected to it. With that said, the weather is still a little cold these days and everything will not be open until the June 28th, 2022 official NYC opening date.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment